Roughing dimensions of the body must be adjusted.
Minimum height of roof drain terminal.
P 1503 4 1 secondary emergency overflow drains or scuppers.
If water proof deck covering thickness is greater or less than 3 16 lip dimension must be specified.
A horizontal gap of minimum 10mm between frame front edge and drainage.
The modern roof drain is designed to drain off rainwater in the most effec.
The waterproof membrane flashing extends fully below the door frame bottom rail and is sealed to.
By the 1997 edition of the upc section 1101 11 2 had been added that completely prescribed where and how secondary roof drainage was to be provided.
P 1503 4 roof drainage.
Flange will have a minimum 4 width with a 3 16 lip at drain body.
This article describes several methods for determining the drainage capacity required to safely drain water off of building roofs whether from rainfall melting snow or a combination of those water sources.
Once the drainage system is determined the designer must ensure positive drainage by correctly positioning the roof drains.
Any increase in the size of the vent shall be made inside the structure a minimum of 1 foot 305 mm below the roof or inside the wall.
4 except for a fresh air inlet where a vent pipe is terminated in open air the terminal shall be located.
Overflow drains shall be the same size as the roof drains with the inlet flow line two inches above the low point of the roof and shall be installed independent from the roof drains.
Cast iron roof drain with 2 in.
Roof drainage requirements specifications.
Design and installation of roof drainage systems shall comply with section 1503 of this code and sections 1106 and 1108 as applicable of the international plumbing code.
C the vent pipe is increased to not less than 3 in.
Watts drainage products rd 300 r series 4 in.
A good rule to follow is to provide two roof drains for a total roof area less than 10 000 square feet.
In sizebefore penetrating a wall or roof and d where the buildingis 4 storeys or less in height the vent pipe terminates above the roof of the building.
An additional roof drain should be added for each 10 000 square foot area.