How to cut siding near the roof line.
Minimum distance from cedar siding to roofing.
Ground contact areas trim such as water table or skirt boards must be a minimum of 6 inches but better to be 18 above the ground.
Slope is defined as the change in height rise as compared to the distance up the roof area run and is measured in inches.
The closer to the grade the sooner your siding will deteriorate.
Having your siding too close to the ground is just asking for trouble.
For example a slope of 4 12 means 4 inches of rise for every 12 inches in run.
Trim such as water table or skirt boards must be a minimum of 6 inches above the grade.
For cedar siding over wood sheathing nailed at studs for application over foam sheathing add the thickness of the foam to the tabulated nail length.
I recently inspected a new 4 5 million dollar home for one of my clients and one of the problems i found was the patio was poured too high and is touching the siding ceder shingles.
Can i put new cedar shingle siding over my existing cedar shingle siding.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
Roof ground clearance.
Siding and trim that extends down to a roof dormers second floors etc and decks requires a minimum of a 2 inch gap to avoid wicking.
The number of board spaces between the soffit and bottom of the lowest piece of siding at the foundation should be such that the overlap is as per the table.
Details like this let me stay profitable and allow me.
How i detail the rake.
Start with the bottom course using a furring strip to support the lower edge.
Each succeeding course overlaps the upper edge of the previous one by a minimum of 1 inch.
Instead of a standard straight cut you must cut these pieces.
Wall construction like all siding materials western red cedar performs best when installed properly on a suitable frame.
Homes with gables at different levels on the roofs often have siding that meets the roof line.
I added in my report a note that 2 minimum clearance is required between the siding and the patio surface.
I run a trim board along the rake keeping this the required distance above the roof surface and bring my siding board down to the trim maintaining a 1 4 inch gap that gets caulked.
The material can be installed across the minimum 3 of.