Secure corner plates using four 6 x 1 2 screws d.
Mayline parallel bar installation instructions.
Up and down arrows will open main level menus and toggle through sub tier links.
Examine the pulley mounts.
2 9 out of 5 stars 4.
Place each pulley between your thumb and index finger.
Parallel with worksurface edge.
These products are also called mayline parallel straightedges parallel drafting bars parallel bars and parallel straightedges.
Only 1 left in stock order soon.
Align cable parallel with edge of board stedge stop cable 1b cable 1a 9.
Be sure that the cable passes between cable clamp and l h.
Alvin paral liner 1101 48 mobile parallel straightedge 48 inches.
Install cable clamp e onto stud of left corner plate c.
Be sure cable passes between clamp and corner plate.
Ball bearing rollers available in metal recommended for vellum bond and delrin for drafting film.
The wire used to move the parallel bar up and down is mounted on a series of pulleys which are in turn mounted to the drafting board with screws.
Align cable parallel with edge of board as shown in fig.
Drill 3 32 pilot holes at marked locations.
Free shipping by amazon.
Instructions to convert above board parallel rule to under board attachment when ordering components specific color and or size information may be required.
Ball bearing rollers built into durable black phenolic plastic base.
Mayline parallel straightedge options explained.
Transparent blade for see through registration and fine line drawing quality.
Get it as soon as wed sep 9.
Attach cable ends with terminals to spring.
Turn knob f onto stud.
Parallel straightedge replacement parts can be found here.
The drafting bar literally floats across the drawing surface and come with all mounting hardware.
Left and right arrows move across top level links and expand close menus in sub levels.
Remember to read all the instructions before beginning the installation or you may miss the opportunity to install the metal clips which stop your bar for moving side side or worse you could damage the bar.
66 and 72 rectangular desk assembly instructions ard7230 ard6630 ard6030.
E z grip cap the e z grip cap is a handy 5 16 raised gripping bar that allows for easy maneuverability.
Contact a mayline customer service representative.
Even in today s world of electronics many design professionals are still using parallel straightedges to draw a line that is square drafting triangles or helping with quick sketches before reproducing your ideas electronically.
1 16 of 101 results for mayline parallel bar price and other details may vary based on size and color.
This parallel bar moves seemlessly across the drawing surface has resulted in little to no smudging and in conjuction with a proper set.
Overview straightedge mobile parallel ruling w e z grip.